Go to file
Stephen Seo 26b1f43746 Update Sprint 3 backlog, create Sprint 4 backlog 2022-03-28 16:19:47 +09:00
back_end Impl graceful shutdown of backend on failure 2022-03-18 23:43:15 +09:00
front_end Refactor: Replace calling JS settimeout with Rust 2022-03-23 16:56:25 +09:00
retrospectives Sprint 3 Retrospective, update backlogs 2022-03-28 16:14:10 +09:00
spreadsheets Update Sprint 3 backlog, create Sprint 4 backlog 2022-03-28 16:19:47 +09:00
README.md Update /README.md about the back-end 2022-03-16 12:27:22 +09:00
backend_database_specification.md Update backend_database_specification.md 2022-03-23 16:12:36 +09:00
backend_protocol_specification.md Up. Sprint 3 backlog, update backend protocol spec 2022-03-18 15:16:27 +09:00

README.md

Four-Line Dropper: A project developed via Agile methodologies

The directory front_end holds a Rust project for the "front_end" code. Or in other words, it holds the client-side code for the project. The MVP (Minimum Viable Product) started with just the front_end, and if all the goals are met, then the "front_end" may connect to a "back_end" for networked gameplay.

The directory back_end holds a Rust project for the "back_end" code. It holds the server-side code for the project. It is mainly used to handle "Networked Multiplayer" mode for the game.

The directory spreadsheets hold LibreOffice Calc documents that are spreadsheets organizing the work. There is a document for User Stories, a document for the Product Backlogs, and there will be a document for each Sprint.

What is Four-Line Dropper?

Four-Line Dropper is a game where two players take turns dropping tokens into a board. Making a line of four tokens long horizontally, vertically, or diagonally is the win condition of the game. If the board fills up with no four-line matches, then the game ends in a draw. The game is called "Four-Line Dropper" to avoid clashing with the game's original name that is trademarked (this game is a clone of an existing game).